I have read through the project report and discussed with the engineer responsible for the project and we have the comments below:
1) No objection to the construction of granite slab pathway with one side surface channel and the refinement of underground drainage system.
2) The number of shelters and seats to be installed are 8 and 13 respectively, which do not tally with the respective original proposal of 6 and 10.
3) We are welcome to the construction of toilets and dog toilets, even though dog toilets has never been mentioned in the preliminary plan.
4) The provision of soft landscape is a must while the addition of lamp posts, notice boards and store cabinets are excessive, considering the tight financial budget.
  

Top answer

I have read through the project report and discussed it with the engineer responsible for the projec t, and we have the comments below: 1) We have n o objection to the construction of a granit e-s lab pathway with one side surface channel and the refinement of underground drainage system. 2) The numbe rs of shelters and seats to be installed are 8 and 13 respectively, which do not tally with the respective origina lly propo sed of 6 and 10. 3) We are welcome to the construction of toilets and dog toilets, even though dog toilets has never been were never mentioned in the preliminary plan.

  • I have read through the project report and discussed it with the engineer responsible for the projec t, and we have the comments below: 1) We have n o objection to the construction of a granit e-s lab pathway with one side surface channel and the refinement of underground drainage system.
  • 2) The numbe rs of shelters and seats to be installed are 8 and 13 respectively, which do not tally with the respective origina lly propo sed of 6 and 10.
  • 3) We are welcome to the construction of toilets and dog toilets, even though dog toilets has never been were never mentioned in the preliminary plan.
  • 4) The provision of soft landscape is a must while the addition of lam pp osts, noti ceb oards and store cabinets are excessive, considering the tight financial budget.
  • I don't understand the highlighted text.
Free · every Monday

Get the Weekly English Kit 📬

New words, one handy idiom, and a 2-minute quiz — delivered to your inbox to keep your streak alive.

1 Answers
0
I have read through the project report and discussed it with the engineer responsible for the project, and we have the comments below:
1) We have no objection to the construction of a granite-slab pathway with one side surface channel and the refinement of undergroun