I have read through the project report and discussed it with the engineer responsible for the projec t, and we have the comments below: 1) We have n o objection to the construction of a granit e-s lab pathway with one side surface channel and the refinement of underground drainage system. 2) The numbe rs of shelters and seats to be installed are 8 and 13 respectively, which do not tally with the respective origina lly propo sed of 6 and 10. 3) We are welcome to the construction of toilets and dog toilets, even though dog toilets has never been were never mentioned in the preliminary plan.
New words, one handy idiom, and a 2-minute quiz — delivered to your inbox to keep your streak alive.