Please help to correct the sentences below.Thanks

Based on the design problem, I envisaged three options to resolve it.

The first option was to change the air conditioning unit from cassette type to duct type.
Another option was that the units should be all constructed from non-combustible materials which were specified in the circular letter.
Removal of the units from the design was the final option due to air conditioning as a non-essential demand in the lobby, having a reduction of cooling energy use as well as energy saving.

  

Top answer

Ben9108 The first option was to change the air conditioning unit from cassette type to duct type. The second option was to construct all the units from non-combustible materials which were specified in the circular letter. The third option was to remove units from the design as air conditioning is not required in the lobby and thus saving energy and reducing the quantum of cooling energy use.

  • Ben9108 The first option was to change the air conditioning unit from cassette type to duct type.
  • The second option was to construct all the units from non-combustible materials which were specified in the circular letter.
  • The third option was to remove units from the design as air conditioning is not required in the lobby and thus saving energy and reducing the quantum of cooling energy use.
Free · every Monday

Get the Weekly English Kit 📬

New words, one handy idiom, and a 2-minute quiz — delivered to your inbox to keep your streak alive.

1 Answers
0
Ben9108The first option was to change the air conditioning unit from cassette type to duct type. The second option was to construct all the units from non-combustible materials which were specified in the circular letter. The third option was to remove units from the design as air conditioning is not require