As for the new drainage route proposed by the consultant, we had considered it as option 1 earlier, but then we rejected it because the project would be difficult and costly. In addition, we had to consider the electrical panels and cables at the back of the wall. I request that you to look into this matter and advise whether we should go with the consultant's new proposals or continue the project as planned.