The diagrams given illustrate the cross-sectors of two tunnels including one linking France and Italy and the other linking two Japanese islands.
Overall, it is clear evidence that the railway tunnel in Japan is longer than the road tunnel. Moreover, It took more time to build the Japanese railway tunnel than Mont-Blanc road tunnel.
While the depth of the distance in the railway tunnels was 53.85 km, compared to 0,24 km of the road tunnel between France and Italy. The same pattern was seen in the length of the tunnel, which was 53.85km and 11.6 km of railway tunnel and road tunnel respectively.
Construction years of the two tunnels were vastly different. The number of years of road tunnel built was 8 years in comparison with 42 years building railway one. A noticeable thing is that Japanese tunnel was built under the sea as opposed to the tunnel linking France and Italy was built under a mountain.
The two diagrams given illustrate the cross- sectors (wrong word) of two tunnels, including one the Mont Blanc Road tunnel linking France and Italy and the Seikan Railway tunnel other linking two Japanese islands. Overall, i t is clear evidence that the railway tunnel in Japan is longer than the road tunnel. Moreover, It (wrong capitalization) took more time than five times longer to build the Japanese railway tunnel than the Mon t-B lanc (wrong punctuation) road tunnel.
New words, one handy idiom, and a 2-minute quiz — delivered to your inbox to keep your streak alive.
The two diagrams given illustrate the cross-sectors (wrong word) of two tunnels, including one the Mont Blanc Road tunnel linking France and Italy and the Seikan Railway tunnel other