Chalk piano 681 Posted 8 years ago
Essay & Composition Writing

Letter for motor replacement

I would like to seek someone to check my letter below. Thanks


Referring to site inspection dated 01 Jan 2017 at ABC building regarding the verification of new motors provided by the client, it was identified that the new 220V motors provided by the client were totally discrepancy with existing 380V motors.

Comparing between new and existing 100 nos. motors, the capability will be dropped down obviously about 30% after the replacement of work for systems.

In order to maintain the existing design, it is highly recommended that 380V motors should be arranged for the replacement work.

  

Top answer

Referring to the site inspection dated 01 Jan 2017 at ABC B uilding regarding the verification of new motors provided by the client, it was identified that the new 22 0V motors provided by the client were totally discrepancy incompatible with the existing 380V motors. Comparing between the new and existing 100 nos. ] .

  • Referring to the site inspection dated 01 Jan 2017 at ABC B uilding regarding the verification of new motors provided by the client, it was identified that the new 22 0V motors provided by the client were totally discrepancy incompatible with the existing 380V motors.
  • Comparing between the new and existing 100 nos.
  • ] .
  • In order to maintain the existing design, it is highly recommended that 380V motors should be arranged for the replacement work.
Free · every Monday

Get the Weekly English Kit 📬

New words, one handy idiom, and a 2-minute quiz — delivered to your inbox to keep your streak alive.

1 Answers
0

Referring to the site inspection dated 01 Jan 2017 at ABC Building regarding the verification of new motors provided by the client, it was identified that the new 220V motors provided by the client were totally discrepancy incompat