PO will be just signed by management and note that as per BCR-KOM document, Bider confirmed as follows;
This issue will be discussed with bidder on 05.04.2018 . we team discussed the possible location of Vacuum Deaerator. Ejector system ( specially pump ) will be placed below the Vacuum Deaerator as per attached layout bidder agreed with concept.
However, bidder informed that the ejector system area width (4~ 5 m) is seems to be small ( 13m L x 5m W x 6m H). we requested bidder to inform actual size requirement , if any increase in width is required same will be discussed and decided mutually. bidder will inform the space requirement within 1 week after PO
In that case, you can proceed further that have already agreed with the mentioned concept.