0
Ben9108 Posted 18 years ago
Letter Writing

Explanation for fail water report

I would be grateful if someone could help to correct my letter shown as below.

The case is all water supply system require to take part in a safety scheme of country and submit water analysis report and form to government regularly. Fail report is found in past and remedy the system in present.



Dear Government

Our company (XYZ) is facilities manager of FFF building. As water supply system installed in the building is taking part in the safety scheme, we would like to submit the safety form for Nov 2007 for your information.



From the past water analysis report, some mineral contents were found that those has exceeded the limit. The reason is a malfunction of pump lead to the system was operating in abnormal. Subsequent to the promptly repair, the system has been resumed as normal and the performance of the system is also indicated in the attached water analysis report for Dec 2007. Please feel free to contact me if you have any queries at tel: 123456.



Engineer
  

Top answer

To *** Department, Government of *** Our company (XYZ) is the facilities manager for FFF Building . As the water supply system installed in the building is a part of the safety scheme, we would like to submit the safety form for November 2007 for your information. In the past water analysis report, some mineral content was found that exceeded the limit.

  • To *** Department, Government of *** Our company (XYZ) is the facilities manager for FFF Building .
  • As the water supply system installed in the building is a part of the safety scheme, we would like to submit the safety form for November 2007 for your information.
  • In the past water analysis report, some mineral content was found that exceeded the limit.
  • The reason is that the pump leading in to the system was operating abnormally .
  • Subsequent to its prompt repair, the system has resumed normal functioning .
Free · every Monday

Get the Weekly English Kit 📬

New words, one handy idiom, and a 2-minute quiz — delivered to your inbox to keep your streak alive.

1 Answers
0
To *** Department, Government of ***

Our company (XYZ) is the facilities manager for FFF Building. As the water supply system installed in the building is a part of the safety scheme, we would like to submit the safety form for November 2007 for your information.