The pictures compare the layout of a school site as it was in 2004 with a proposed design for the year 2024.
Overall, the main changes will be made in terms of facilities and school amenities. Remarkably, there will be a new road running from west to east, and this road links the first car park with the second one in the north-east of the school site.
In detail, the school site located in the north of the map in the original design. There were a car park and the school entrance in the north-western corner of the map. In 2004, the number of students was 600, and the two school buildings were separated by a path running from the main entrance to the sports field. It is expected that the number of students in 2024 will almost double that of 2004, and the sports field will be replaced by a third school building. Furthermore, the plan is to join the two original school buildings by a skyway. It will shorten the path that links the building with each other. As the construction of the new school building and the second car park, the sports field will be moved to the south. A new road will also be built from the main entrance to the second car park.
The pictures compare the layout of a school site as it was in 2004 with a proposed design for the year 2024. Overall, the main changes will be made in terms of the parking facilities and school buildings amenities . (Wrong usage.
New words, one handy idiom, and a 2-minute quiz — delivered to your inbox to keep your streak alive.
The pictures compare the layout of a school site as it was in 2004 with a proposed design for the year 2024.
Overall, the main changes will be made in terms of the parking facilities and school buildings amenities. (Wrong usage. An