Anonymous Posted 8 years ago
Grammar

Are these sentences grammatically correct

As we discussed and agreed in the meeting, we all understand that we could have avoided these damages to the plumbing conduits if we had a as-built drawing, but there is no as-built drawing available at present.

However, we all agreed that the work is in progress and it has not yet been completed, and our office is well aware of the issue and fix them before we proceed the screed work.

We request that MEP consultant to carry out a test and commissioning on the water and drainage line before proceeding the flooring work, and it was agreed in the meeting.

  

Top answer

As we discussed in the meeting, we all understand and agree that we could have avoided these damages to the plumbing conduits if we had had an as-built drawing, but there is no as-built drawing available at present. However ("however" isn't logical to me here) , we all agreed that the work is in progress, it has not yet been completed, and our office is well aware of the issues and will fix them before we proceed the screed work. We request that the MEP consultant carry out a test and a commissioning on the water and drainage line before proceeding with the flooring work.

  • As we discussed in the meeting, we all understand and agree that we could have avoided these damages to the plumbing conduits if we had had an as-built drawing, but there is no as-built drawing available at present.
  • However ("however" isn't logical to me here) , we all agreed that the work is in progress, it has not yet been completed, and our office is well aware of the issues and will fix them before we proceed the screed work.
  • We request that the MEP consultant carry out a test and a commissioning on the water and drainage line before proceeding with the flooring work.
  • This, too, was agreed upon in the meeting.
Free · every Monday

Get the Weekly English Kit 📬

New words, one handy idiom, and a 2-minute quiz — delivered to your inbox to keep your streak alive.

1 Answers
0

As we discussed in the meeting, we all understand and agree that we could have avoided these damages to the plumbing conduits if we had had an as-built drawing, but there is no as-built drawing available at present.

However ("however" isn't logical to me here), we all agreed that the work is in progress, it has not yet been complete